/FLORISTON FILTRATION PROJECT
3,076active

Site Progression Reports

FLORISTON FILTRATION PROJECT

20 photos at this spot

60%

The site transitioned from initial clearing to significant infrastructure development, including earthmoving, grading, and partial tank construction. Final site grading remains to be completed.

20 photos · 10 analyzed39.39116, -120.02133 1 milestoneMar 14, 2026

20 photos at this spot

60%

The construction project involved trenching and pipe installation along a roadwork site over approximately 294 days. Visible progress includes excavation, pipe installation, and site preparation, indicating significant infrastructure upgrades.

20 photos · 10 analyzed39.39475, -120.02265 2 milestonesMar 12, 2026

20 photos at this spot

80%

The site transformed from a covered mound of earth to a developed area with installed structures and materials ready for further installation. Key developments include the delivery of construction materials, installation of cylindrical structures, and preparation for additional infrastructure.

20 photos · 10 analyzed39.39119, -120.02137 1 milestoneMar 10, 2026

16 photos at this spot

50%

The waterline construction project progressed from initial site marking to partial pipeline installation and trench formation by the end of the series. The site appears to be mid-project, with significant trenching and groundwork visible.

16 photos · 10 analyzed39.39458, -120.02141 2 milestonesMar 10, 2026

5 photos at this spot

60%

The site progressed from initial excavation work on a sloped terrain to a more leveled and organized construction area near a railway. The presence of equipment and significant earthworks indicates ongoing construction activities.

5 photos · 5 analyzed39.39252, -120.02215 1 milestoneMar 10, 2026

20 photos at this spot

85%

The construction site evolved from initial groundwork to the installation of infrastructure and significant progress in utilities over 225 days. Excavation, formwork setup, and pipe installation are key visible developments.

20 photos · 10 analyzed39.39140, -120.02126 4 milestonesMar 10, 2026

9 photos at this spot

80%

The construction site transitioned from a utility excavation to completed pipe installation in the trench over the span of 56 days. Significant progress includes excavation, pipe laying, and partial backfilling.

9 photos · 9 analyzed39.39372, -120.02265 2 milestonesMar 10, 2026

20 photos at this spot

80%

Over the 139-day period, the site has transitioned from initial clearing and excavation to the installation of utility systems and partial backfilling. By the end, utility infrastructure is mostly installed within a completed trench, indicating advanced progress.

20 photos · 10 analyzed39.39335, -120.02268 4 milestonesMar 10, 2026

20 photos at this spot

85%

Over the course of 86 days, the site transitioned from initial excavation to the installation of new infrastructure, including trenching and pipe placement. The work area appears near completion with recent backfilling activity.

20 photos · 10 analyzed 5 milestonesMar 10, 2026

3 photos at this spot

30%

Over the course of 16 days, significant excavation took place and major earth-moving operations were evident. The area progressed from an untouched or natural state to being prepped with machinery indicating active development.

3 photos · 3 analyzed 1 milestoneMar 10, 2026

20 photos at this spot

100%

The construction site progressed from an initial undisturbed state to a completed water line installation with surface restoration. Key activities included excavation, pipe installation, and backfilling.

20 photos · 10 analyzed39.39466, -120.02226 5 milestonesMar 10, 2026

20 photos at this spot

80%

The series of photos documents the excavation and installation of piping in a roadway, followed by trench backfilling and site restoration. The site progresses from initial excavation to final grading and surface restoration.

20 photos · 10 analyzed 5 milestonesMar 10, 2026