/FLORISTON FILTRATION PROJECT
3,076active
All Reports

20 photos at this spot

20 photos · 10 analyzed 39.39335, -120.02268 Mar 10, 2026 · 11:11 AM

80%

completion

First

Jun 25, 2025

139 days

Last

Nov 11, 2025

Over the 139-day period, the site has transitioned from initial clearing and excavation to the installation of utility systems and partial backfilling. By the end, utility infrastructure is mostly installed within a completed trench, indicating advanced progress.

Construction Milestones4 / 6 detected

Excavation
Trench Completion
Pipe Installed
Backfill Complete
Concrete Poured
Grading Finished

Start Condition

The site is in an initial state with a focus on clearing; an excavator is present, but no significant excavation is yet visible.

Current Condition

A further developed site with utility infrastructure partially completed in trenches, some sections backfilled and preparing for final grading.

Timeline

Excavation

Jun 26, 2025

Ground broken and trenching initiated for utility installation

Trench Completion

Jun 26, 2025

Trench appears to be dug fully to grade with utilities being installed

Pipe Installed

Jun 27, 2025

Utility pipes laid in the trench with visible infrastructure setup

Backfill Complete

Jun 27, 2025

Trenches are partially backfilled, covering some utility installations

Work Types Observed

excavationtrenchingutility installationbackfilling

Next Steps

Final grading and site leveling, possibly followed by paving or additional surface work.

Photos in this Report (20)

6/25/25

6/26/25

6/26/25

6/26/25

6/26/25

6/27/25

6/27/25

6/27/25

6/27/25

6/30/25

6/30/25

7/31/25

7/31/25

7/31/25

7/31/25

10/27/25

10/27/25

10/27/25

10/27/25

11/11/25