80%
completion
First
Jun 25, 2025
139 days
Last
Nov 11, 2025
Over the 139-day period, the site has transitioned from initial clearing and excavation to the installation of utility systems and partial backfilling. By the end, utility infrastructure is mostly installed within a completed trench, indicating advanced progress.
Start Condition
The site is in an initial state with a focus on clearing; an excavator is present, but no significant excavation is yet visible.
Current Condition
A further developed site with utility infrastructure partially completed in trenches, some sections backfilled and preparing for final grading.
Excavation
Jun 26, 2025
Ground broken and trenching initiated for utility installation
Trench Completion
Jun 26, 2025
Trench appears to be dug fully to grade with utilities being installed
Pipe Installed
Jun 27, 2025
Utility pipes laid in the trench with visible infrastructure setup
Backfill Complete
Jun 27, 2025
Trenches are partially backfilled, covering some utility installations
Final grading and site leveling, possibly followed by paving or additional surface work.
6/25/25
6/26/25
6/26/25
6/26/25
6/26/25
6/27/25
6/27/25
6/27/25
6/27/25
6/30/25
6/30/25
7/31/25
7/31/25
7/31/25
7/31/25
10/27/25
10/27/25
10/27/25
10/27/25
11/11/25