/FLORISTON FILTRATION PROJECT
3,076active
All Reports

20 photos at this spot

20 photos · 10 analyzed 39.39466, -120.02226 Mar 10, 2026 · 10:39 AM

100%

completion

First

Mar 14, 2025

241 days

Last

Nov 10, 2025

The construction site progressed from an initial undisturbed state to a completed water line installation with surface restoration. Key activities included excavation, pipe installation, and backfilling.

Construction Milestones5 / 6 detected

Excavation
Trench Completion
Pipe Installed
Backfill Complete
Concrete Poured
Grading Finished

Start Condition

The site was undisturbed with a marked road indicating waterline plans.

Current Condition

The site is restored with visible surface elements indicating completed installation.

Timeline

Initial Marking

Mar 14, 2025

Site marking for planned water line location

Excavation Started

Apr 7, 2025

Excavation of trench for water line

Trench Prepared

Aug 7, 2025

Trench completed and ready for pipe installation

Pipe Installation

Aug 7, 2025

Pipes laid in trench

Backfill Complete

Sep 5, 2025

Trench filled back in

Surface Grading

Sep 5, 2025

Surface graded, area leveled and compacted

Final Completion

Sep 8, 2025

Site restored, work completed

Work Types Observed

excavationpipe installationbackfillingsurface grading

Next Steps

No further construction activities anticipated as work appears complete.

Photos in this Report (20)

3/14/25

4/7/25

8/7/25

8/7/25

8/7/25

8/7/25

8/7/25

8/8/25

9/5/25

9/5/25

9/8/25

9/8/25

9/8/25

9/8/25

9/8/25

9/8/25

9/9/25

9/9/25

9/9/25

11/10/25