85%
completion
First
Mar 11, 2025
225 days
Last
Oct 22, 2025
The construction site evolved from initial groundwork to the installation of infrastructure and significant progress in utilities over 225 days. Excavation, formwork setup, and pipe installation are key visible developments.
Start Condition
Initial groundwork with partial excavation and gravel spread.
Current Condition
Infrastructure installed with trenches backfilled and utility connections nearing completion.
Initial Groundwork
Mar 11, 2025
Groundwork begins with gravel spread and initial excavation visible.
Formwork Installation
Mar 11, 2025
Wooden formwork installed for concrete structure.
Structure and Equipment Installation
Mar 24, 2025
Installation of vertical tank structure on site.
Pipe Installation
Mar 24, 2025
Blue pipes installed for utilities in the trench.
Trench Completion
Mar 26, 2025
Trenching listed to completion with visible pipework in place.
Final grading and surface finishing, connection of utilities, and site cleanup are expected next.
3/11/25
3/11/25
3/11/25
3/11/25
3/11/25
3/11/25
3/24/25
3/24/25
3/24/25
3/26/25
4/7/25
9/26/25
9/26/25
10/9/25
10/16/25
10/16/25
10/17/25
10/17/25
10/22/25
10/22/25