/FLORISTON FILTRATION PROJECT
3,076active
All Reports

20 photos at this spot

20 photos · 10 analyzed 39.39140, -120.02126 Mar 10, 2026 · 11:49 AM

85%

completion

First

Mar 11, 2025

225 days

Last

Oct 22, 2025

The construction site evolved from initial groundwork to the installation of infrastructure and significant progress in utilities over 225 days. Excavation, formwork setup, and pipe installation are key visible developments.

Construction Milestones4 / 6 detected

Excavation
Trench Completion
Pipe Installed
Backfill Complete
Concrete Poured
Grading Finished

Start Condition

Initial groundwork with partial excavation and gravel spread.

Current Condition

Infrastructure installed with trenches backfilled and utility connections nearing completion.

Timeline

Initial Groundwork

Mar 11, 2025

Groundwork begins with gravel spread and initial excavation visible.

Formwork Installation

Mar 11, 2025

Wooden formwork installed for concrete structure.

Structure and Equipment Installation

Mar 24, 2025

Installation of vertical tank structure on site.

Pipe Installation

Mar 24, 2025

Blue pipes installed for utilities in the trench.

Trench Completion

Mar 26, 2025

Trenching listed to completion with visible pipework in place.

Work Types Observed

excavationformworkutility installationbackfilling

Next Steps

Final grading and surface finishing, connection of utilities, and site cleanup are expected next.

Photos in this Report (20)

3/11/25

3/11/25

3/11/25

3/11/25

3/11/25

3/11/25

3/24/25

3/24/25

3/24/25

3/26/25

4/7/25

9/26/25

9/26/25

10/9/25

10/16/25

10/16/25

10/17/25

10/17/25

10/22/25

10/22/25