/FLORISTON FILTRATION PROJECT
3,076active
All Reports

9 photos at this spot

9 photos · 9 analyzed 39.39372, -120.02265 Mar 10, 2026 · 11:34 AM

80%

completion

First

May 28, 2025

56 days

Last

Jul 23, 2025

The construction site transitioned from a utility excavation to completed pipe installation in the trench over the span of 56 days. Significant progress includes excavation, pipe laying, and partial backfilling.

Construction Milestones2 / 6 detected

Excavation
Trench Completion
Pipe Installed
Backfill Complete
Concrete Poured
Grading Finished

Start Condition

An exposed utility hole with soil erosion.

Current Condition

Pipes installed in trench, partially backfilled.

Timeline

Initial Inspection

May 28, 2025

Site inspection of existing utility exposure

Initial Excavation

Jul 2, 2025

Excavation work visible, trench being dug

Pipe Installation

Jul 23, 2025

Pipes installed in the trench

Work Types Observed

excavationpipe installationsite inspection

Next Steps

Complete backfilling the trench, grade the site, and possibly pour concrete if needed.

Photos in this Report (9)

5/28/25

5/28/25

7/1/25

7/2/25

7/2/25

7/2/25

7/10/25

7/22/25

7/23/25