80%
completion
First
May 28, 2025
56 days
Last
Jul 23, 2025
The construction site transitioned from a utility excavation to completed pipe installation in the trench over the span of 56 days. Significant progress includes excavation, pipe laying, and partial backfilling.
Start Condition
An exposed utility hole with soil erosion.
Current Condition
Pipes installed in trench, partially backfilled.
Initial Inspection
May 28, 2025
Site inspection of existing utility exposure
Initial Excavation
Jul 2, 2025
Excavation work visible, trench being dug
Pipe Installation
Jul 23, 2025
Pipes installed in the trench
Complete backfilling the trench, grade the site, and possibly pour concrete if needed.
5/28/25
5/28/25
7/1/25
7/2/25
7/2/25
7/2/25
7/10/25
7/22/25
7/23/25