/FLORISTON FILTRATION PROJECT
3,076active
All Reports

20 photos at this spot

20 photos · 10 analyzed 39.39119, -120.02137 Mar 10, 2026 · 9:56 PM

80%

completion

First

Mar 12, 2025

323 days

Last

Jan 29, 2026

The site transformed from a covered mound of earth to a developed area with installed structures and materials ready for further installation. Key developments include the delivery of construction materials, installation of cylindrical structures, and preparation for additional infrastructure.

Construction Milestones1 / 6 detected

Excavation
Trench Completion
Pipe Installed
Backfill Complete
Concrete Poured
Grading Finished

Start Condition

The site is covered with a tarp, indicating protection of materials or terrain from the elements.

Current Condition

The area appears developed with remnants of construction materials, suggesting site preparation for next phases.

Timeline

Site Preparation

Mar 12, 2025

Initial site covered, possibly for protection of materials or features beneath.

Material Delivery

Mar 24, 2025

Delivery of significant construction materials including blue pipes.

Structure Installation

Apr 10, 2025

Cylindrical structures being erected with assistance from heavy machinery.

Concrete Platform Established

Apr 16, 2025

Presence of a large concrete platform indicating progress in structural installation.

Work Types Observed

site preparationmaterial deliverystructural installationconcrete pouring

Next Steps

Complete structural installations, initiate landscape grading, and begin installation of any remaining pipelines or systems.

Photos in this Report (20)

3/12/25

3/12/25

3/24/25

3/24/25

3/27/25

4/10/25

4/11/25

4/16/25

4/16/25

4/16/25

4/23/25

5/6/25

5/9/25

5/15/25

6/5/25

10/13/25

10/14/25

10/14/25

10/14/25

1/29/26