/FLORISTON FILTRATION PROJECT
3,076active
All Reports

5 photos at this spot

5 photos · 5 analyzed 39.39252, -120.02215 Mar 10, 2026 · 12:20 PM

60%

completion

First

May 7, 2025

40 days

Last

Jun 16, 2025

The site progressed from initial excavation work on a sloped terrain to a more leveled and organized construction area near a railway. The presence of equipment and significant earthworks indicates ongoing construction activities.

Construction Milestones1 / 6 detected

Excavation
Trench Completion
Pipe Installed
Backfill Complete
Concrete Poured
Grading Finished

Start Condition

The site was heavily vegetated with uneven terrain and visible machinery starting excavation work.

Current Condition

The area is more leveled, with piles of materials and construction machinery actively working, indicating continued progress towards site preparation.

Timeline

Excavation Start

May 7, 2025

Initial ground breaking and excavation work began.

Grading and Earthwork

Jun 16, 2025

Ongoing earthwork and grading activities visible.

Work Types Observed

excavationearth movinggrading

Next Steps

Further grading activities, possibly starting foundation work or preparing for infrastructure installation.