No caption
IMG_6828.JPG
Details
Tuesday, March 25, 2025 · 7:32 AM
39.39468, -120.02069· 1663m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 250
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue3.4672
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:25
GPSDestBearing25.0761
GPSDestBearingRefTrue North
GPSHPositioningError5.4315
GPSImgDirection25.0761
GPSImgDirectionRefT
GPSSpeed0.2040
GPSSpeedRefK
GPSTimeStamp14:32:54
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0207
MeteringModePattern
ModifyDate2025-03-25T07:32:55.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized638
SubSecTimeOriginal638
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a flat roof near a building with visible plywood panels laid down. The wood shows signs of wear and possible exposure to the elements. There are no visible personnel or active work taking place. The surrounding area includes trees and some brush, with telephone lines overhead.
other
plywood roof decking clear sky with daylight no visible access obstruction
No safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
other
roof-inspectioncondition-assessment
0m
excavation
excavationsite-preparation
compactor
1m
electrical
electrical-installationcable-management
electrical-panels
1m
excavation
excavationtrench
excavator
2m
survey layout
surveyinglayout
level rod
2m
trenching
pipe-installationtrenching
soil
2m
site grading
soil-compactionexcavation-preparation
excavator
2m
other
material-stagingmarking
logs
2m
paving surface restoration
surface-markingsfirewood
wood
2m
other
roof-inspectionsafety-assessment