No caption
IMG_9757.JPG
Details
Wednesday, August 27, 2025 · 11:02 AM
39.39469, -120.02067· 1616m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/203sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.5487
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:08:27
GPSDestBearing272.9351
GPSDestBearingRefTrue North
GPSHPositioningError11.8859
GPSImgDirection272.9351
GPSImgDirectionRefT
GPSSpeed1.6459
GPSSpeedRefK
GPSTimeStamp18:2:49
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0207
MeteringModePattern
ModifyDate2025-08-27T11:02:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.6668
Software18.6.1
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized585
SubSecTimeOriginal585
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A trench is visible with a green pipe extending horizontally along the bottom. A vertical gray pipe intersects the trench, likely for connection purposes. The trench is dug through dark soil with visible soil layers and some roots exposed. No personnel or active machinery are visible in the frame.
trenching
exposed soil with layers and some roots overcast or shaded lighting open trench without visible barriers or equipment
No safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
soil-compactionexcavation-preparation
excavator
1m
excavation
excavationtrench
excavator
2m
excavation
excavationsite-preparation
compactor
2m
other
roof-inspectioncondition-assessment
2m
other
roofing-preparationroof-surface-work
plywood
2m
electrical
electrical-installationcable-management
electrical-panels
3m
survey layout
surveyinglayout
level rod
3m
paving surface restoration
surface-markingsfirewood
wood
3m
other
material-stagingmarking
logs
3m
inspection documentation
roof-inspectionvisual-assessment
stacked-firewood