No caption
IMG_1805.JPG
Details
Wednesday, December 3, 2025 · 10:35 AM
39.39468, -120.02069· 1660m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 160
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue4.3745
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:12:03
GPSDestBearing78.0834
GPSDestBearingRefTrue North
GPSHPositioningError5.8212
GPSImgDirection78.0834
GPSImgDirectionRefT
GPSSpeed0.3883
GPSSpeedRefK
GPSTimeStamp18:35:8
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0207
MeteringModePattern
ModifyDate2025-12-03T10:35:09.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized072
SubSecTimeOriginal072
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavation site for a generator pad next to a building. The earth has been removed to create a flat area, and a compactor is visible resting on the left side of the cleared area. The excavated soil exposes roots and rocks along the walls. A wheelbarrow and some fencing materials are evident in the background near the building.
excavation
exposed soil with roots and small rocks daylight with no adverse weather visible limited access with equipment and materials adjacent to building
No safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
other
roofing-preparationroof-surface-work
plywood
0m
other
roof-inspectioncondition-assessment
1m
electrical
electrical-installationcable-management
electrical-panels
1m
excavation
excavationtrench
excavator
2m
survey layout
surveyinglayout
level rod
2m
trenching
pipe-installationtrenching
soil
2m
other
material-stagingmarking
logs
2m
paving surface restoration
surface-markingsfirewood
wood
2m
site grading
soil-compactionexcavation-preparation
excavator
2m
other
roof-inspectionsafety-assessment