No caption
IMG_1800.JPG
Details
Wednesday, December 3, 2025 · 9:20 AM
39.39469, -120.02071· 1663m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 250
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue3.0879
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:12:03
GPSDestBearing87.7097
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection87.7097
GPSImgDirectionRefT
GPSSpeed0.5400
GPSSpeedRefK
GPSTimeStamp17:20:41
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0207
MeteringModePattern
ModifyDate2025-12-03T09:20:41.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.1
SubjectArea{"0":1427,"1":1111,"2":165,"3":166}
SubSecTimeDigitized584
SubSecTimeOriginal584
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A person in PPE is using surveying equipment in a deep excavated pit next to a building. A level rod is being held vertically, suggesting measurement or layout activities. The surrounding environment includes exposed soil and rocks with visible roots.
survey-layout
exposed soil and rocks with roots daylight visible accessible excavation with safety measures
PPE is visible; an open trench presents a hazard.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
other
material-stagingmarking
logs
1m
paving surface restoration
surface-markingsfirewood
wood
1m
other
roof-inspectionsafety-assessment
1m
inspection documentation
roof-inspectionvisual-assessment
stacked-firewood
2m
excavation
excavationsite-preparation
compactor
2m
other
roofing-preparationroof-surface-work
plywood
2m
other
roof-inspectioncondition-assessment
3m
trenching
pipe-installationtrenching
soil
3m
electrical
electrical-installationcable-management
electrical-panels
3m
excavation
excavationtrench
excavator