No caption
IMG_9783.JPG
Details
Thursday, August 28, 2025 · 7:53 AM
39.39198, -120.02166· 1662m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/121sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue4.4074
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:28
GPSDestBearing280.9808
GPSDestBearingRefTrue North
GPSHPositioningError3.4524
GPSImgDirection280.9808
GPSImgDirectionRefT
GPSSpeed0.3210
GPSSpeedRefK
GPSTimeStamp14:53:30
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-08-28T07:53:31.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.9235
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized885
SubSecTimeOriginal885
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A silt fence and wire mesh are installed along the edge of a cleared and slightly sloped area, likely to prevent sediment erosion. The ground shows signs of previous water flow, with visible sediment paths. The area is bordered by trees and vegetation on one side.
swppp-erosion-control
bare soil with sediment trails overcast or early morning light unobstructed edge along vegetation
Safety features such as PPE are not visible, but a silt fence acts as a barrier.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
swppp erosion control
erosion-controlswppp-measures
mini-excavator
1m
trenching
trenchingearthmoving
excavator
1m
pipeline installation
pipeline-installationpipe-joint-protection
hand-tools
1m
site grading
site-gradingsoil-disturbance
excavator
1m
survey layout
surveyinglayout
gps-receiver
2m
site grading
gradingslope-clearing
bulldozer
2m
site grading
vehicle-parkingsite-grading
trucks
2m
site grading
site-accessgrading
2m
trenching
pipeline-trenchingpipe-installation
shovel
2m
trenching
trenchingexcavation
soil