No caption
IMG_7470.JPG
Details
Wednesday, April 30, 2025 · 2:48 PM
39.39197, -120.02167· 1660m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/977sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue2.9709
BrightnessValue8.8884
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0013
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:04:30
GPSDestBearing197.8496
GPSDestBearingRefTrue North
GPSHPositioningError4.0633
GPSImgDirection197.8496
GPSImgDirectionRefT
GPSSpeed0.3758
GPSSpeedRefK
GPSTimeStamp21:48:14
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-04-30T14:48:14.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.9316
Software18.5
SubjectArea{"0":2001,"1":1494,"2":2207,"3":1335}
SubSecTimeDigitized754
SubSecTimeOriginal754
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker operating a compaction machine on a sloped trench. An excavator is positioned at the top of the slope, indicating active earthmoving. The terrain is uneven, with visible loose soil and rocks. The worker is wearing a hard hat, hi-vis vest, and work boots.
trenching
loose soil, rocky slope partly cloudy limited access on slope
Basic PPE such as hard hat, hi-vis vest, and work boots are visible, but no additional safety controls are observed.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
swppp erosion control
erosion-controlswppp-measures
mini-excavator
0m
pipeline installation
pipeline-installationpipe-joint-protection
hand-tools
1m
swppp erosion control
erosion-controlsilt-fence-installation
silt-fence-material
1m
site grading
site-gradingsoil-disturbance
excavator
1m
site grading
vehicle-parkingsite-grading
trucks
2m
survey layout
surveyinglayout
gps-receiver
2m
site grading
site-accessgrading
2m
trenching
trench-excavationearthworks
soil
2m
trenching
trenchingsoil
soil
2m
pipeline installation
pipe-installationtrenching
hand tool