No caption
IMG_7544.JPG
Details
Friday, May 2, 2025 · 11:56 AM
39.39197, -120.02165· 1659m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/619sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.2405
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:02
GPSDestBearing205.7085
GPSDestBearingRefTrue North
GPSHPositioningError2.4099
GPSImgDirection205.7085
GPSImgDirectionRefT
GPSSpeed0.3678
GPSSpeedRefK
GPSTimeStamp18:56:8
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-05-02T11:56:08.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.2743
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized809
SubSecTimeOriginal809
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a graded slope extending upwards in a forested area. The soil appears disturbed with evident machine track marks. An excavator can be seen partially in the frame on the right side. Trees are present along the slope, suggesting clearing activities might have occurred. The bright daylight suggests sufficient natural lighting for the activities.
site-grading
graded soil with machine tracks bright daylight appears clear with visible access along slope
No specific safety measures are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
swppp erosion control
erosion-controlsilt-fence-installation
silt-fence-material
1m
trenching
trenchingearthmoving
excavator
1m
swppp erosion control
erosion-controlswppp-measures
mini-excavator
1m
pipeline installation
pipeline-installationpipe-joint-protection
hand-tools
1m
trenching
trenchingexcavation
soil
2m
survey layout
surveyinglayout
gps-receiver
2m
site grading
gradingslope-clearing
bulldozer
2m
trenching
trenchingexcavation-work
excavator
2m
trenching
pipeline-trenchingpipe-installation
shovel
2m
site grading
vehicle-parkingsite-grading
trucks