No caption
IMG_7759.JPG
Details
Monday, May 12, 2025 · 3:00 PM
39.39198, -120.02168· 1661m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1437sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.6665
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:12
GPSDestBearing162.0703
GPSDestBearingRefTrue North
GPSHPositioningError2.8648
GPSImgDirection162.0703
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:0:49
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-05-12T15:00:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.4886
Software18.5
SubjectArea{"0":2849,"1":2137,"2":3291,"3":1884}
SubSecTimeDigitized950
SubSecTimeOriginal950
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A dirt road or path runs upward on a steep incline through a forested area. The ground appears freshly disturbed with tire tracks visible on the surface. Vegetation including trees and shrubs lines both sides of the path. There is no visible construction equipment or personnel in the image.
site-grading
dirt with tire tracks overcast steep path, no visible congestion
No safety features are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipeline-installation
excavator
1m
trenching
pipe-alignmenttrenching-activity
wrench
1m
trenching
trenchingpipe-installation
blue pipes
2m
trenching
trenchingearthmoving
excavator
2m
swppp erosion control
erosion-controlswppp-measures
mini-excavator
2m
pipeline installation
piping-installationtrenching
shovels
2m
pipeline installation
pipeline-installationpipe-joint-protection
hand-tools
2m
swppp erosion control
erosion-controlfiber-roll-installation
fiber-roll
2m
survey layout
surveyinglayout
gps-receiver
2m
swppp erosion control
erosion-controlsilt-fence-installation
silt-fence-material