No caption
IMG_9782.JPG
Details
Thursday, August 28, 2025 · 7:53 AM
39.39197, -120.02167· 1661m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/238sISO 200
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue4.1391
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:28
GPSDestBearing323.0632
GPSDestBearingRefTrue North
GPSHPositioningError3.5736
GPSImgDirection323.0632
GPSImgDirectionRefT
GPSSpeed0.0272
GPSSpeedRefK
GPSTimeStamp14:53:27
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-08-28T07:53:28.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.8954
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized701
SubSecTimeOriginal701
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a work area with erosion control measures in place, including a silt fence on the left. A mini excavator is located on a dirt path, surrounded by rocks and vegetation. The scene suggests ongoing work related to erosion control or preparation of the area. No construction workers or additional safety equipment are visible.
swppp-erosion-control
dirt path with rocks bright daylight limited access via dirt path
No personnel safety equipment is visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingearthmoving
excavator
0m
pipeline installation
pipeline-installationpipe-joint-protection
hand-tools
1m
swppp erosion control
erosion-controlsilt-fence-installation
silt-fence-material
1m
site grading
site-gradingsoil-disturbance
excavator
1m
site grading
vehicle-parkingsite-grading
trucks
2m
survey layout
surveyinglayout
gps-receiver
2m
site grading
site-accessgrading
2m
trenching
trenchingsoil
soil
2m
trenching
trench-excavationearthworks
soil
2m
pipeline installation
pipe-installationtrenching
hand tool