No caption
IMG_1161.JPG
Details
Monday, October 27, 2025 · 2:07 PM
39.39374, -120.02373· 1630m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3891sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.8325
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:10:27
GPSDestBearing21.7309
GPSDestBearingRefTrue North
GPSHPositioningError130.1381
GPSImgDirection21.7309
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:7:38
HostComputeriPhone 16 Pro
latitude39.3937
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0237
MeteringModePattern
ModifyDate2025-10-27T14:07:40.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software26.0.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized794
SubSecTimeOriginal794
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a blue pipe with a black cap sticking out from a partially excavated or backfilled area. The ground appears to be mainly soil, with some gravel visible near the top edge. A shadow of a person taking a photo covers part of the area, suggesting the photo was likely taken by a worker on site.
backfill
soil and gravel with visible excavation bright sunlight casting strong shadows not visibly congested
No safety features are visible in frame
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
site-gradingsoil-compaction
compaction-roller
8m
trenching
trenchingpipe-laying
reciprocating-saw
8m
trenching
trenchingpipeline-installation
excavator
13m
trenching
trenchingpipeline-installation
bulldozer
17m
pipeline installation
pipeline-inspectionpipe-installation
steel pipes
22m
trenching
trenchingpipe-installation
soil
23m
trenching
pipeline-excavationtrenching
pipe wrench
28m
other
fire-hydrant-installationsite-work
gravel
29m
site grading
site-gradingtraffic-cones
roller-compactor
30m
site grading
site-gradingearthwork
bulldozer