No caption
IMG_0737.JPG
Details
Monday, October 6, 2025 · 1:01 PM
39.39374, -120.02374· 1625m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2370sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue8.3600
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0052
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:06
GPSDestBearing147.6236
GPSDestBearingRefTrue North
GPSHPositioningError192.6065
GPSImgDirection147.6236
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:1:16
HostComputeriPhone 16 Pro
latitude39.3937
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0237
MeteringModePattern
ModifyDate2025-10-06T13:01:19.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.2105
Software26.0.1
SubjectArea{"0":2932,"1":2104,"2":3157,"3":1890}
SubSecTimeDigitized408
SubSecTimeOriginal408
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A person in a hi-vis vest with a hard hat stands near a large tree on sloped terrain. A yellow compaction roller is visible on graded soil, indicating active site grading. The area appears to be prepared for further work, with several logs stacked to the side and undisturbed surrounding vegetation. Bright sunlight suggests clear weather.
site-grading
graded dirt with visible tire tracks clear weather with bright sunlight open and accessible area with minor vegetation
PPE visible includes hard hats and hi-vis vests; potential hazards include uneven ground.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
backfill
backfillexcavation
soil
9m
trenching
trenchingpipe-laying
reciprocating-saw
9m
trenching
trenchingpipeline-installation
excavator
14m
trenching
trenchingpipeline-installation
bulldozer
18m
pipeline installation
pipeline-inspectionpipe-installation
steel pipes
23m
trenching
trenchingpipe-installation
soil
23m
trenching
pipeline-excavationtrenching
pipe wrench
28m
other
fire-hydrant-installationsite-work
gravel
29m
site grading
site-gradingtraffic-cones
roller-compactor
29m
site grading
site-gradingearthwork
bulldozer