No caption
IMG_0572.JPG
Details
Tuesday, September 30, 2025 · 3:32 PM
39.39380, -120.02354· 1633m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/822sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.1771
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:30
GPSDestBearing119.1803
GPSDestBearingRefTrue North
GPSHPositioningError133.4007
GPSImgDirection119.1803
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:32:17
HostComputeriPhone 16 Pro
latitude39.3938
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0235
MeteringModePattern
ModifyDate2025-09-30T15:32:19.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.6825
Software26.0
SubjectArea{"0":4558,"1":224,"2":257,"3":261}
SubSecTimeDigitized605
SubSecTimeOriginal605
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with two parallel pipelines; one is blue and the other is green. Two workers wearing hard hats and hi-vis jackets are inspecting or working on the pipes. The pipes are supported by wooden blocks, and there is visible wiring or cabling attached to them. The trench walls are earthen and display an uneven, rocky surface.
pipeline-installation
rocky trench overcast open access with visible trench
PPE is visible with potential open-trench hazard present.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
9m
trenching
trenchingpipe-laying
reciprocating-saw
10m
trenching
trenchingpipeline-installation
excavator
10m
trenching
trenchingpipe-installation
soil
16m
trenching
trenchingpipeline-installation
bulldozer
17m
backfill
backfillexcavation
soil
18m
site grading
site-gradingsoil-compaction
compaction-roller
19m
trenching
trenchingpipeline-installation
excavator
27m
trenching
pipe-handlingtrench-preparation
bulldozer
30m
trenching
trenchingpipeline-installation
excavator
30m
other
tapinggroundwork
duct-tape