No caption
IMG_1519.JPG
Details
Tuesday, November 11, 2025 · 10:05 AM
39.39373, -120.02347· 1625m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/428sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.7268
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:11:11
GPSDestBearing334.8065
GPSDestBearingRefTrue North
GPSHPositioningError60.2704
GPSImgDirection334.8065
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:5:26
HostComputeriPhone 16 Pro
latitude39.3937
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0235
MeteringModePattern
ModifyDate2025-11-11T10:05:26.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.7411
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized776
SubSecTimeOriginal776
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavated trench revealing a blue PVC pipe and a copper pipe. The blue PVC pipe is capped at the end, and the copper pipe appears to be joined with the PVC pipe. The surrounding area includes loose soil and gravel, indicating recent trench work or excavation.
trenching
soil and gravel in an excavated trench natural daylight visible open trench with immediate access
Safety features are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
10m
pipeline installation
pipeline-inspectionpipe-installation
steel pipes
11m
trenching
trenchingpipeline-installation
excavator
16m
trenching
trenchingpipe-laying
reciprocating-saw
18m
trenching
trenchingpipeline-installation
excavator
20m
trenching
trenchingpipeline-installation
excavator
22m
other
tapinggroundwork
duct-tape
22m
backfill
backfillexcavation
soil
23m
trenching
trenchingexcavation
excavator
23m
site grading
site-gradingsoil-compaction
compaction-roller
24m
trenching
trenchingexcavation-work
excavator