No caption
IMG_8861.JPG
Details
Thursday, July 17, 2025 · 10:50 AM
39.39379, -120.02366· 1622m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1689sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue8.3787
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:17
GPSDestBearing353.8662
GPSDestBearingRefTrue North
GPSHPositioningError43.6435
GPSImgDirection353.8662
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:50:22
HostComputeriPhone 16 Pro
latitude39.3938
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0237
MeteringModePattern
ModifyDate2025-07-17T10:50:23.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.7221
Software18.6
SubjectArea{"0":2857,"1":2137,"2":3145,"3":1886}
SubSecTimeDigitized917
SubSecTimeOriginal917
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench where blue pipes are being laid, with a worker standing inside the trench. An excavator is positioned next to the trench, likely assisting with digging or placing pipes. The surrounding area includes natural vegetation and a dirt pathway. One worker is wearing a hi-vis jacket and appears to be inspecting or working on the pipeline.
trenching
dirt with an open trench sunny conditions accessible via a dirt path
PPE is visible but no safety controls such as barriers or trench boxes are in frame.
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingpipe-laying
reciprocating-saw
8m
backfill
backfillexcavation
soil
9m
trenching
trenchingpipeline-installation
bulldozer
9m
site grading
site-gradingsoil-compaction
compaction-roller
10m
pipeline installation
pipeline-inspectionpipe-installation
steel pipes
18m
trenching
trenchingpipe-installation
soil
25m
trenching
pipeline-excavationtrenching
pipe wrench
28m
trenching
trenchingpipeline-installation
excavator
30m
site grading
site-gradingtraffic-cones
roller-compactor
31m
pipeline installation
pipeline-stagingpipes
pipelines