No caption
IMG_7221.JPG
Details
Tuesday, April 15, 2025 · 3:38 PM
39.39200, -120.02164· 1662m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/137sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.8317
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:15
GPSDestBearing200.7771
GPSDestBearingRefTrue North
GPSHPositioningError13.9991
GPSImgDirection200.7771
GPSImgDirectionRefT
GPSSpeed0.7498
GPSSpeedRefK
GPSTimeStamp22:38:20
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-04-15T15:38:21.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.0979
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized980
SubSecTimeOriginal980
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An excavator is actively digging a narrow trench along a forested path. The excavator's bucket is lowered into the trench, indicating ongoing work. The terrain is rocky and uneven, with trees lining both sides of the trench. The work is occurring in a natural setting with visible vegetation.
trenching
rocky soil with trench natural daylight, overcast uneven ground with trees on either side
Safety features are not visible in frame
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
pipeline installation
pipeline-installationtrenching
soil
2m
trenching
pipeline-trenchingpipe-installation
shovel
2m
site grading
gradingslope-clearing
bulldozer
2m
survey layout
survey-setupsite-survey
survey-instrument
3m
trenching
trenchingpipe-staging
blue piping
3m
survey layout
surveyinglayout
gps-receiver
3m
trenching
trenchingexcavation
soil
3m
trenching
trenchingpipe-installation
excavator
4m
site grading
site-gradingsoil-disturbance
excavator
4m
trenching
trenchingutility-preparation
backhoe