No caption
IMG_6800.JPG
Details
Monday, March 24, 2025 · 1:34 PM
39.39202, -120.02163· 1658m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/664sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.1247
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:24
GPSDestBearing256.4944
GPSDestBearingRefTrue North
GPSHPositioningError4.1478
GPSImgDirection256.4944
GPSImgDirectionRefT
GPSSpeed0.1066
GPSSpeedRefK
GPSTimeStamp20:34:52
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-03-24T13:34:53.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.3760
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized534
SubSecTimeOriginal534
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a yellow survey instrument mounted on a tripod in a dry, rocky, and vegetated area. The terrain includes shrubs and small trees, with rocky soil visible on the ground. No active construction work or personnel are present in the image. The scene appears to be part of a survey process in a mountainous or hilly region.
survey-layout
rocky soil with dry vegetation clear weather with natural daylight natural terrain allowing equipment setup
No safety features are visible in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingutility-preparation
backhoe
2m
trenching
trenchingexcavation
excavator
3m
pipeline installation
pipeline-installationtrenching
soil
4m
trenching
trenchingexcavation
4m
trenching
pipeline-trenchingpipe-installation
shovel
4m
swppp erosion control
erosion-controlsilt-fence-installation
shovel
4m
trenching
trenchingpipe-staging
blue piping
4m
site grading
gradingslope-clearing
bulldozer
5m
survey layout
surveyinglayout
gps-receiver
5m
trenching
trenchingpipe-installation
excavator