No caption
IMG_7058.JPG
Details
Tuesday, April 8, 2025 · 2:26 PM
39.39655, -120.02034· 1679m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/6173sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.2117
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:08
GPSDestBearing22.3180
GPSDestBearingRefTrue North
GPSHPositioningError13.9906
GPSImgDirection22.3180
GPSImgDirectionRefT
GPSSpeed0.5617
GPSSpeedRefK
GPSTimeStamp21:26:24
HostComputeriPhone 16 Pro
latitude39.3965
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0203
MeteringModePattern
ModifyDate2025-04-08T14:26:25.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.5917
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized633
SubSecTimeOriginal633
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an area where excavation appears to be happening, with a shovel on a dirt road. There are rocks and soil scattered near the path, indicating recent digging activity. In the background, a fenced facility with tall structures is visible, possibly related to water treatment. The path leading to the facility is unpaved and slopes upward.
excavation
dirt road with rocky terrain clear sky with daylight unpaved road with clear access to hillside
Safety controls like fences are visible; no PPE visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
3m
other
dirt-roadpine-trees
5m
excavation
trenchingdepth-measurement
power-drill
6m
site grading
caution-areasite-marking
soil
6m
excavation
hole-excavationdepth-measurement
measuring-tape
6m
trenching
trenchingpipe-placement
excavator
8m
other
access-road-constructionantennas
antennas
9m
excavation
measurementhole-measurement
tape-measure
15m
site grading
site-access-preparationroad-marking
16m
excavation
excavationroad-access
excavator
18m
site grading
site-gradingequipment-positioning
excavator