No caption
IMG_0260.JPG
Details
Thursday, September 18, 2025 · 8:47 AM
39.39671, -120.02030· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/284sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.4769
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:18
GPSDestBearing79.0343
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection79.0343
GPSImgDirectionRefT
GPSSpeed0.1256
GPSSpeedRefK
GPSTimeStamp15:47:7
HostComputeriPhone 16 Pro
latitude39.3967
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0203
MeteringModePattern
ModifyDate2025-09-18T08:47:08.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.1478
Software26.0
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized581
SubSecTimeOriginal581
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavator on a dirt slope, adjacent to a telecommunications tower and a cylindrical structure, likely a raw water tank. The surrounding area has low vegetation and rocky, uneven ground. No workers or construction operations are visible, and the environment appears to be a natural landscape with construction elements.
site-grading
rocky, vegetated slope overcast lighting limited access due to slope
No specific safety controls or PPE visible in frame
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
other
preconstructionsite-access
4m
excavation
excavationroad-access
excavator
11m
excavation
measurementhole-measurement
tape-measure
13m
excavation
hole-excavationdepth-measurement
measuring-tape
13m
trenching
trenchingpipe-placement
excavator
14m
site grading
caution-areasite-marking
soil
15m
excavation
trenchingdepth-measurement
power-drill
16m
other
access-road-inspectionutility-access
steel-access-cover
16m
inspection documentation
inspectionsite-inspection
tank
16m
other
access-roadsite-access
telecommunications-pole