No caption
IMG_7055.JPG
Details
Tuesday, April 8, 2025 · 2:21 PM
39.39658, -120.02031· 1684m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4587sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.0073
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:04:08
GPSDestBearing15.2202
GPSDestBearingRefTrue North
GPSHPositioningError5.9252
GPSImgDirection15.2202
GPSImgDirectionRefT
GPSSpeed0.0244
GPSSpeedRefK
GPSTimeStamp21:21:32
HostComputeriPhone 16 Pro
latitude39.3966
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0203
MeteringModePattern
ModifyDate2025-04-08T14:21:33.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.1634
Software18.4
SubjectArea{"0":2017,"1":1508,"2":1161,"3":665}
SubSecTimeDigitized132
SubSecTimeOriginal132
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an open trench with a measuring tape extended from the bottom to the edge, displaying depth measurements. A yellow power drill is resting on the ground beside the trench. The surrounding area appears to be outdoors with dry soil and sparse vegetation. The photograph is likely part of an excavation project related to water treatment plant work.
excavation
loose soil and gravel clear daylight conditions open and dry excavation area
No specific safety features or PPE visible in frame
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
excavation
hole-excavationdepth-measurement
measuring-tape
5m
excavation
excavationdigging
shovel
5m
trenching
trenchingpipe-placement
excavator
5m
site grading
caution-areasite-marking
soil
7m
excavation
measurementhole-measurement
tape-measure
8m
other
dirt-roadpine-trees
13m
excavation
excavationroad-access
excavator
13m
other
access-road-constructionantennas
antennas
15m
site grading
site-gradingequipment-positioning
excavator
16m
other
preconstructionsite-access