No caption
IMG_0413.JPG
Details
Monday, September 22, 2025 · 2:06 PM
39.39660, -120.02036· 1697m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4975sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue9.7578
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:22
GPSDestBearing343.4738
GPSDestBearingRefTrue North
GPSHPositioningError89.8291
GPSImgDirection343.4738
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:6:18
HostComputeriPhone 16 Pro
latitude39.3966
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0204
MeteringModePattern
ModifyDate2025-09-22T14:06:21.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.2805
Software26.0
SubjectArea{"0":2359,"1":2589,"2":228,"3":227}
SubSecTimeDigitized014
SubSecTimeOriginal014
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trenching operation with a worker inside a trench using an excavator. The worker is holding onto a pipe, and there are several pipes or rods visible in the trench. The excavator arm is positioned over the trench. The soil surface is uneven, with visible rocks or hard material.
trenching
uneven soil with rocks sunny and clear lighting limited visible staging space in trench
PPE such as a hi-vis vest is visible; caution tape surrounds trench for safety.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
caution-areasite-marking
soil
2m
excavation
hole-excavationdepth-measurement
measuring-tape
3m
excavation
measurementhole-measurement
tape-measure
5m
excavation
trenchingdepth-measurement
power-drill
6m
excavation
excavationdigging
shovel
8m
other
dirt-roadpine-trees
10m
excavation
excavationroad-access
excavator
13m
other
access-road-constructionantennas
antennas
13m
site grading
site-gradingequipment-positioning
excavator
14m
other
preconstructionsite-access