No caption
IMG_7057.JPG
Details
Tuesday, April 8, 2025 · 2:21 PM
39.39663, -120.02036· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1980sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.7731
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:04:08
GPSDestBearing13.6521
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection13.6521
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:21:47
HostComputeriPhone 16 Pro
latitude39.3966
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0204
MeteringModePattern
ModifyDate2025-04-08T14:21:47.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.9514
Software18.4
SubjectArea{"0":2017,"1":1508,"2":1161,"3":665}
SubSecTimeDigitized739
SubSecTimeOriginal739
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a tape measure extended vertically to measure the depth of a hole in the ground. The sides of the hole are surrounded by loose soil, and some concrete or stone material is visible inside at the bottom. The environment appears dry with a shadow indicating sunlight.
excavation
loose soil and rocky material sunny with shadows open area with visible access
Safety features are not visible in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
trenching
trenchingpipe-placement
excavator
4m
excavation
hole-excavationdepth-measurement
measuring-tape
4m
site grading
caution-areasite-marking
soil
7m
excavation
trenchingdepth-measurement
power-drill
7m
excavation
excavationroad-access
excavator
9m
excavation
excavationdigging
shovel
11m
site grading
site-gradingequipment-positioning
excavator
11m
other
preconstructionsite-access
11m
other
dirt-roadpine-trees
16m
site grading
site-access-preparationroad-marking