No caption
IMG_8702.JPG
Details
Wednesday, July 9, 2025 · 3:14 PM
39.39202, -120.02130· 1666m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3226sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue9.6517
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.3597
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat65
GPSDateStamp2025:07:09
GPSDestBearing252.7401
GPSDestBearingRefTrue North
GPSHPositioningError3.8751
GPSImgDirection252.7401
GPSImgDirectionRefT
GPSSpeed0.0084
GPSSpeedRefK
GPSTimeStamp22:14:23
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-07-09T15:14:25.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.6554
Software18.5
SubjectArea{"0":2011,"1":1506,"2":1109,"3":661}
SubSecTimeDigitized050
SubSecTimeOriginal050
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a dirt road with visible silt fencing running along the right side as part of SWPPP erosion control measures. Vegetation is present on either side of the road, and the area seems to be surrounded by trees. There are no construction vehicles or personnel visible in the frame.
swppp-erosion-control
dirt road bright sunlight accessible vehicle path
No PPE or active safety measures are visible within frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
swppp erosion control
dirt-roadloose-rock
gravel
3m
site grading
soil-compactionaccess-road-maintenance
roller-compactor
4m
swppp erosion control
erosion-controlpathway-access
gravel
4m
swppp erosion control
erosion-controlsediment-control
mulch
8m
paving surface restoration
road-maintenancesite-access
wooden-supports
9m
swppp erosion control
road-monitoringgravel-road
10m
site grading
site-gradingerosion-control
gravel
13m
trenching
trenchingmaterial-placement
soil
14m
pipeline installation
pipeline-installationtrenching-work
gravel
15m
excavation
excavator-operationsite-clearing
tracked excavator