No caption
IMG_0961.JPG
Details
Thursday, October 16, 2025 · 12:37 PM
39.39194, -120.02142· 1688m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3021sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.1040
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:16
GPSDestBearing287.8425
GPSDestBearingRefTrue North
GPSHPositioningError57.0665
GPSImgDirection287.8425
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp19:37:49
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-10-16T12:37:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.5609
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized619
SubSecTimeOriginal619
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows two workers in a trench working on installing blue pipelines. The trench has been dug in a rocky, soil area with some gravel present. Several red valves are attached to the blue pipes. The environment surrounds by trees indicating a remote or semi-remote location.
pipeline-installation
rocky soil with gravel in an open trench clear weather with good natural lighting limited congestion with clear access to the trench
Safety equipment such as hi-vis vests and work boots are visible; the trench is open and the ground is uneven.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
swppp erosion control
erosion-controlsediment-management
wood chips
6m
swppp erosion control
road-monitoringgravel-road
7m
trenching
trenchingpiping-installation
blue pipes
8m
pipeline installation
pipeline-installationtrench-work
hand tools
10m
swppp erosion control
erosion-controlsediment-control
mulch
10m
swppp erosion control
erosion-controlpathway-access
gravel
11m
excavation
excavator-operationsite-clearing
tracked excavator
12m
site grading
site-gradingerosion-control
gravel
13m
swppp erosion control
dirt-roadloose-rock
gravel
13m
site grading
soil-compactionaccess-road-maintenance
roller-compactor