No caption
IMG_7906.JPG
Details
Tuesday, May 20, 2025 · 1:48 PM
39.39266, -120.02264· 1632m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/3891sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue10.3326
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:20
GPSDestBearing159.1791
GPSDestBearingRefTrue North
GPSHPositioningError3.7689
GPSImgDirection159.1791
GPSImgDirectionRefT
GPSSpeed0.0030
GPSSpeedRefK
GPSTimeStamp20:48:15
HostComputeriPhone 16 Pro
latitude39.3927
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-05-20T13:48:16.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized451
SubSecTimeOriginal451
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows multiple PVC conduits aligned parallel inside an open trench. Conduits are secured with tie wraps and supported by plastic spacers. The trench is excavated in a dirt or rocky area, with visible measuring tape indicating spacing or alignment. No machinery or workers are visible in the frame.
pipeline-installation
dirt or rocky trench sunny or clear lighting no obstructions in trench
Safety controls are not visible in frame, open trench poses a hazard.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
electrical
conduit-measurementconduit-installation
measuring tape
1m
trenching
duct-bank-installationtrenching
gravel
2m
pipeline installation
conduit-alignmentmeasurement-check
tape-measure
2m
trenching
trenchingearthwork
yellow compactor
2m
site grading
site-gradingroller
roller
2m
pipeline installation
conduit-measurementpipeline-installation
tape-measure
3m
excavation
excavationearth-moving
excavator
3m
other
site-preparationequipment-staging
construction-vehicle
3m
swppp erosion control
tarpingerosion-control
rocks
4m
excavation
excavationgrading
excavator