No caption
IMG_7908.JPG
Details
Tuesday, May 20, 2025 · 1:49 PM
39.39266, -120.02262· 1631m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2320sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.7134
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:20
GPSDestBearing204.8527
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection204.8527
GPSImgDirectionRefT
GPSSpeed0.0712
GPSSpeedRefK
GPSTimeStamp20:49:3
HostComputeriPhone 16 Pro
latitude39.3927
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-05-20T13:49:05.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.1800
Software18.5
SubjectArea{"0":2003,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized019
SubSecTimeOriginal019
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows multiple conduits aligned in a trench, measured using a tape measure held by a gloved hand. The conduits are supported by black spacers. The trench is filled with compacted soil, and the scene is in an outdoor setting under clear daylight.
pipeline-installation
compacted soil in trench clear daylight visible trench access
No specific safety PPE visible. Fence indicates area control, but open trench is visible.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
pipeline installation
conduit-measurementpipeline-installation
tape-measure
1m
electrical
conduit-measurementconduit-installation
measuring tape
2m
trenching
duct-bank-installationtrenching
gravel
2m
pipeline installation
duct-bank-installationconduit-laying
pvc
2m
excavation
excavationearth-moving
excavator
3m
other
site-preparationequipment-staging
construction-vehicle
3m
trenching
trenchingearthwork
yellow compactor
3m
site grading
soil-compactioncompactor
compactor
4m
trenching
trenchingcompacting
excavator
4m
swppp erosion control
tarpingerosion-control
rocks