No caption
IMG_0745.JPG
Details
Monday, October 6, 2025 · 4:01 PM
39.39268, -120.02264· 1627m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1534sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.4051
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:06
GPSDestBearing168.5956
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection168.5956
GPSImgDirectionRefT
GPSSpeed1.0043
GPSSpeedRefK
GPSTimeStamp23:1:33
HostComputeriPhone 16 Pro
latitude39.3927
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-10-06T16:01:34.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5828
Software26.0.1
SubjectArea{"0":1999,"1":1510,"2":2205,"3":1321}
SubSecTimeDigitized167
SubSecTimeOriginal167
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a dirt access road with small construction vehicles and assorted construction materials on the left side. The site is located in a hilly area with pine trees. No active work is visible, but staging of equipment and materials is evident. One construction cone is visible, suggesting minor traffic control at the area.
other
dirt path with some rocks clear and sunny materials and equipment staged on side of road, no congestion visible
One cone is visible for minor traffic control; other safety measures are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
excavationearth-moving
excavator
2m
trenching
duct-bank-installationtrenching
gravel
2m
excavation
excavationslope-work
excavator
2m
trenching
trenchingearthwork
yellow compactor
2m
trenching
trenchingutility-installation
excavator
2m
pipeline installation
conduit-measurementpipeline-installation
tape-measure
2m
electrical
conduit-measurementconduit-installation
measuring tape
3m
site grading
gradingearthmoving
excavator
3m
pipeline installation
conduit-alignmentmeasurement-check
tape-measure
3m
pipeline installation
duct-bank-installationconduit-laying
pvc