No caption
IMG_0746.JPG
Details
Monday, October 6, 2025 · 4:01 PM
39.39265, -120.02267· 1626m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2976sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.5100
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:10:06
GPSDestBearing167.6055
GPSDestBearingRefTrue North
GPSHPositioningError7.4786
GPSImgDirection167.6055
GPSImgDirectionRefT
GPSSpeed1.0043
GPSSpeedRefK
GPSTimeStamp23:1:35
HostComputeriPhone 16 Pro
latitude39.3927
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-10-06T16:01:36.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.5393
Software26.0.1
SubjectArea{"0":2011,"1":1507,"2":1107,"3":662}
SubSecTimeDigitized430
SubSecTimeOriginal430
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a graded dirt road with a yellow roller machine parked on the right side. To the left, various construction materials such as wooden boards and metal pipes are stacked near a green container. The background includes a hillside with scattered trees. The area appears to be used for material storage and laydown.
site-grading
graded dirt road clear and sunny open area with no visible congestion
No safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
pipeline installation
duct-bank-installationconduit-laying
pvc
3m
excavation
excavationgrading
excavator
3m
excavation
excavationsite-preparation
excavator
3m
trenching
trenchingearthwork
yellow compactor
3m
electrical
conduit-measurementconduit-installation
measuring tape
3m
swppp erosion control
tarpingerosion-control
rocks
3m
trenching
duct-bank-installationtrenching
gravel
3m
site grading
rock-movinggrading
excavator
4m
pipeline installation
conduit-alignmentmeasurement-check
tape-measure
4m
pipeline installation
conduit-measurementpipeline-installation
tape-measure