No caption
IMG_7326.JPG
Details
Wednesday, April 23, 2025 · 2:04 PM
39.39198, -120.02169· 1659m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1167sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.1004
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:23
GPSDestBearing240.7727
GPSDestBearingRefTrue North
GPSHPositioningError19.9049
GPSImgDirection240.7727
GPSImgDirectionRefT
GPSSpeed0.3463
GPSSpeedRefK
GPSTimeStamp21:4:42
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-04-23T14:04:42.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.1884
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized562
SubSecTimeOriginal562
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a trench in a wooded area with visible soil and rock. In the middle of the trench, there is a compacting machine. Blue pipes are being laid in the trench, and a piece of heavy machinery is positioned further down the trench path. Workers are present, engaging in what appears to be pipeline installation.
trenching
soil and rock trench clear weather with sunny lighting clear trench access with machinery in place
Safety features such as PPE and controls are not visible in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
site-accessgrading
1m
trenching
pipe-alignmenttrenching-activity
wrench
1m
trenching
trenchingpipe-installation
blue pipes
2m
pipeline installation
piping-installationtrenching
shovels
2m
swppp erosion control
erosion-controlfiber-roll-installation
fiber-roll
2m
trenching
trenchingearthmoving
excavator
2m
swppp erosion control
erosion-controlswppp-measures
mini-excavator
3m
trenching
trench-excavationearthworks
soil
3m
trenching
trenchingsoil
soil
3m
pipeline installation
pipe-installationtrenching
hand tool