No caption
IMG_0221.JPG
Details
Tuesday, September 16, 2025 · 10:34 AM
39.39462, -120.02079· 1665m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 200
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue3.8504
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:16
GPSDestBearing289.7816
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection289.7816
GPSImgDirectionRefT
GPSSpeed0.6412
GPSSpeedRefK
GPSTimeStamp17:34:31
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0208
MeteringModePattern
ModifyDate2025-09-16T10:34:32.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.0
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized559
SubSecTimeOriginal559
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench dug into the earth with a pipe laid at the bottom. A section of the ground is exposed, revealing layers of soil and possibly pavement. Earth-moving equipment is visible in the background, indicating active or recent earthwork. Hand tools and a section of pipe spool are also visible.
trenching
visible soil and pavement under and around trench clear daylight open access to work area with visible equipment
Safety features like PPE are visible, but trench safety measures are not visible.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
excavation
excavation-workdigging
shovel
4m
site grading
soil-compactionpit-preparation
compactor
4m
pipeline installation
pipeline-installationpipe-fitting
level
4m
excavation
measurementsite-inspection
measuring-tape
5m
trenching
trenchingexcavation
excavator
5m
excavation
excavation-measurementdepth-check
measuring-tape
6m
excavation
excavationpit
soil
7m
trenching
trenchingconduit-installation
excavator
7m
trenching
trenchinginspection
measuring tool
7m
swppp erosion control
erosion-controlswppp
soil