No caption
IMG_0189.JPG
Details
Monday, September 15, 2025 · 10:34 AM
39.39460, -120.02080· 1670m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/407sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.6386
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:15
GPSDestBearing168.8356
GPSDestBearingRefTrue North
GPSHPositioningError15.0520
GPSImgDirection168.8356
GPSImgDirectionRefT
GPSSpeed2.3683
GPSSpeedRefK
GPSTimeStamp17:34:7
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0208
MeteringModePattern
ModifyDate2025-09-15T10:34:07.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.6706
Software26.0
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized932
SubSecTimeOriginal932
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an exposed pit dug in an area adjacent to a building. Soil and rocks are scattered around the pit, and a partially exposed pipe or component is visible at the bottom. There are digging tools, such as a shovel and a pickaxe, resting on the surrounding ground. The ground surface is uneven, with visible rocky debris around the hole.
excavation
rocky soil and dirt bright daylight clear access around excavation
Safety features are not visible in frame; there is an open trench and uneven ground.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingpipe-laying
earth-moving-equipment
5m
excavation
excavationpit
soil
5m
site grading
soil-compactionpit-preparation
compactor
6m
pipeline installation
pipeline-installationpipe-fitting
level
6m
site grading
stake-markingsite-survey
metal-stake
6m
trenching
trenchingexcavation
excavator
6m
trenching
trenchingconduit-installation
excavator
6m
excavation
measurementsite-inspection
measuring-tape
7m
excavation
excavation-measurementdepth-check
measuring-tape
8m
swppp erosion control
erosion-controlswppp
soil