No caption
IMG_0288.JPG
Details
Thursday, September 18, 2025 · 4:38 PM
39.39466, -120.02075· 1660m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/132sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue4.8432
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:18
GPSDestBearing97.3964
GPSDestBearingRefTrue North
GPSHPositioningError6.2149
GPSImgDirection97.3964
GPSImgDirectionRefT
GPSSpeed0.5987
GPSSpeedRefK
GPSTimeStamp23:38:30
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0208
MeteringModePattern
ModifyDate2025-09-18T16:38:30.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.0472
Software26.0
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized897
SubSecTimeOriginal897
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image displays a partially excavated hole with a vertical pipe. A measuring tape is used to gauge the depth of the excavation, showing approximately 16 inches from top to bottom. The surrounding area consists of loose soil and pine needles. The scene suggests preparatory work for infrastructure installation.
excavation
loose soil with pine needles outdoor daylight open access with no visible obstructions
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
measurementsite-inspection
measuring-tape
2m
trenching
trenchinginspection
measuring tool
3m
electrical
electrical-installationutility-room-setup
electrical-panel
4m
site grading
compactionsite-preparation
compaction-tool
4m
demolition
floor-demolitionconcrete-breaking
jackhammer
5m
other
material-stagingmarking
logs
5m
paving surface restoration
surface-markingsfirewood
wood
5m
trenching
trenchingpipe-laying
earth-moving-equipment
5m
other
roof-inspectionsafety-assessment
5m
inspection documentation
roof-inspectionvisual-assessment
stacked-firewood