No caption
IMG_7367.JPG
Details
Friday, April 25, 2025 · 1:03 PM
39.39195, -120.02190· 1656m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/545sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.6732
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:25
GPSDestBearing262.4695
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection262.4695
GPSImgDirectionRefT
GPSSpeed0.0585
GPSSpeedRefK
GPSTimeStamp20:3:28
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-04-25T13:03:28.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.0892
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized568
SubSecTimeOriginal568
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two blue pipes are installed in an open trench, which appears to be partially backfilled. The trench is dug in a rocky and uneven slope, surrounded by trees. Construction equipment is visible in the distance, suggesting ongoing work. The image does not clearly show personnel or active installation work.
pipeline-installation
rocky soil and open trench overcast or cloudy conditions equipment positioned at lower elevation
PPE and safety controls are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
pipeline installation
pipeline-trenchingpipe-installation
excavator
2m
site grading
site-gradingearth
earth
2m
site grading
site-gradingslope-work
lift or machinery near trees
3m
trenching
caution-tape-installationsafety-marking
shovel
3m
pipeline installation
pipeline-installationtrenching
yellow construction equipment
3m
trenching
trenchingexcavation-activity
excavator
3m
trenching
trenchingconduit-installation
hand tools
3m
excavation
excavationearth-moving
excavator
3m
other
walking-pathaccess-path
4m
trenching
trenchingtrench