No caption
IMG_7361.JPG
Details
Friday, April 25, 2025 · 11:17 AM
39.39194, -120.02191· 1659m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/436sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.4750
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:25
GPSDestBearing238.2955
GPSDestBearingRefTrue North
GPSHPositioningError5.4997
GPSImgDirection238.2955
GPSImgDirectionRefT
GPSSpeed0.6839
GPSSpeedRefK
GPSTimeStamp18:17:51
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-04-25T11:17:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.7679
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized629
SubSecTimeOriginal629
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker in a trench connecting or installing blue piping. The trench is located on a sloped, rocky terrain. A piece of heavy machinery is visible near the trench edge, and additional machinery is down the slope. The area is surrounded by trees, and the soil is disturbed, indicating recent work.
pipeline-installation
rocky and uneven terrain overcast lighting accessible from slope, with machinery present
PPE is visible, but no additional safety controls are present.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
site-gradingearth
earth
1m
pipeline installation
piping-installationtrenching
excavator
2m
trenching
trenchingconduit-installation
hand tools
3m
excavation
excavationearth-moving
excavator
3m
trenching
trenchinghillside-trenching
soil
3m
trenching
caution-tape-installationsafety-marking
shovel
3m
excavation
excavationsite-preparation
soil
3m
excavation
excavationearth-moving
construction-materials
3m
site grading
site-gradingslope-work
lift or machinery near trees
3m
trenching
trenchingconduit-installation
excavator