No caption
IMG_7104.JPG
Details
Thursday, April 10, 2025 · 3:27 PM
39.39196, -120.02188· 1654m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/920sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.4681
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:10
GPSDestBearing248.3996
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection248.3996
GPSImgDirectionRefT
GPSSpeed0.8434
GPSSpeedRefK
GPSTimeStamp22:27:36
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-04-10T15:27:37.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.8454
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized365
SubSecTimeOriginal365
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a hilly terrain with dirt, rocks, and vegetation. There is a body of water, possibly a river, in the background near which some construction equipment like a possible lift or machinery and materials are staged. The area is surrounded by trees and rocky surfaces.
site-grading
dirt and rocky slope overcast lighting equipment and materials staged near trees and water
No specific safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
caution-tape-installationsafety-marking
shovel
2m
pipeline installation
pipeline-installationtrenching
yellow construction equipment
2m
pipeline installation
piping-installationtrenching
excavator
3m
trenching
trenchingexcavation-activity
excavator
3m
site grading
site-gradingearth
earth
3m
pipeline installation
pipeline-installationpipe-laying
shovel
3m
pipeline installation
pipeline-trenchingpipe-installation
excavator
4m
trenching
trenchingtrench
4m
swppp erosion control
erosion-controlsilt-fence-installation
silt-fence
5m
pipeline installation
pipe-installationslope-installation
sandy soil