No caption
IMG_7052.JPG
Details
Tuesday, April 8, 2025 · 1:10 PM
39.39141, -120.02124· 1677m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4673sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.7440
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:08
GPSDestBearing60.1641
GPSDestBearingRefTrue North
GPSHPositioningError3.1359
GPSImgDirection60.1641
GPSImgDirectionRefT
GPSSpeed0.1539
GPSSpeedRefK
GPSTimeStamp20:10:47
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-08T13:10:48.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.1901
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized703
SubSecTimeOriginal703
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Wooden supports and rebar are part of a formwork visible in the image. A yellow measuring tape is positioned vertically, likely measuring height relative to the setup. Gravel is present on the ground beneath these components. The setup indicates potential preparations for rebar or concrete work.
rebar-formwork
gravel sunny conditions with shadows adequate space in visible area
No specific safety features are visible in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
rebar formwork
formwork-assemblyfoundation-preparation
electric-drill
0m
excavation
tank-foundation-excavationplastic-sheeting
dirt
0m
site grading
foundation-preparationsite-grading
plastic sheeting
1m
pipeline installation
pipeline-installationvalve-installation
hand-tools
1m
valve vault
valve-vault-installationpiping-assembly
excavator
1m
other
liftingcraning
crane
1m
backfill
backfillpipe-installation
shovel
1m
rebar formwork
formwork-assemblyrebar-placement
gravel
1m
excavation
excavationsurveying
surveying-tools
1m
excavation
foundation-preparationdirt-work
survey-equipment