No caption
IMG_6548.JPG
Details
Tuesday, March 11, 2025 · 4:59 PM
39.39141, -120.02124· 1679m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2165sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.5571
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:11
GPSDestBearing110.0342
GPSDestBearingRefTrue North
GPSHPositioningError2.7525
GPSImgDirection110.0342
GPSImgDirectionRefT
GPSSpeed0.6321
GPSSpeedRefK
GPSTimeStamp23:59:23
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-03-11T16:59:23.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.0798
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized693
SubSecTimeOriginal693
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavated area prepared for a tank foundation, possibly lined with a plastic sheet. The excavation is surrounded by dirt, and there are rocks placed on the plastic. The environment is outdoors with trees in the background. It is unclear if the excavation is complete or if further work is needed.
excavation
excavated dirt sunny and clear no visible congestion or obstruction
No safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
rebar formwork
rebar-formwork-setupmeasurement-activity
measuring-tape
0m
rebar formwork
formwork-assemblyfoundation-preparation
electric-drill
0m
site grading
foundation-preparationsite-grading
plastic sheeting
1m
pipeline installation
pipeline-installationvalve-installation
hand-tools
1m
valve vault
valve-vault-installationpiping-assembly
excavator
1m
other
liftingcraning
crane
1m
backfill
backfillpipe-installation
shovel
1m
rebar formwork
formwork-assemblyrebar-placement
gravel
1m
excavation
excavationsurveying
surveying-tools
1m
excavation
foundation-preparationdirt-work
survey-equipment