No caption
IMG_0960.JPG
Details
Thursday, October 16, 2025 · 11:33 AM
39.39140, -120.02124· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2525sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.8426
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:16
GPSDestBearing15.9596
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection15.9596
GPSImgDirectionRefT
GPSSpeed0.0864
GPSSpeedRefK
GPSTimeStamp18:33:50
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-16T11:33:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.3022
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized817
SubSecTimeOriginal817
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an area with blue piping and red valves positioned around a concrete valve vault. An excavator is present near the top-right corner, likely used for site preparation and trenching. Some tools and a utility box are placed near the components, indicating ongoing installation activities.
valve-vault
loose soil around trench clear daylight conditions open trench with worker access
Safety features like barriers or trench boxes are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
pipeline installation
pipeline-installationvalve-installation
hand-tools
1m
site grading
foundation-preparationsite-grading
plastic sheeting
1m
rebar formwork
formwork-assemblyfoundation-preparation
electric-drill
1m
rebar formwork
rebar-formwork-setupmeasurement-activity
measuring-tape
1m
excavation
tank-foundation-excavationplastic-sheeting
dirt
1m
excavation
foundation-preparationdirt-work
survey-equipment
1m
excavation
excavationsurveying
surveying-tools
1m
excavation
excavationpipe-installation
gravel
1m
site grading
foundation-preparationsite-grading
excavator
1m
site grading
gravel-compactionfoundation-preparation
excavator