No caption
IMG_6510.JPG
Details
Monday, March 10, 2025 · 6:20 PM
39.39139, -120.02124· 1681m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/187sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.9965
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:11
GPSDestBearing88.0155
GPSDestBearingRefTrue North
GPSHPositioningError7.2966
GPSImgDirection88.0155
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp1:20:9
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-03-10T18:20:09.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.5444
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized942
SubSecTimeOriginal942
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a circular excavation area with a central raised dirt section, likely for a tank foundation. The surrounding area is clear with visible construction tools including surveying equipment. The site is located in a wooded area with trees in the background.
excavation
dirt and soil with excavation clear sky with even lighting open access with no visible congestion
No visible PPE or safety controls are present in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
excavation
excavationsurveying
surveying-tools
0m
pipeline installation
pipeline-connectionvalve-installation
level-tool
0m
site grading
foundation-preparationsite-grading
excavator
0m
site grading
gravel-compactionfoundation-preparation
excavator
0m
excavation
excavationpipe-installation
gravel
1m
site grading
slope-stabilizationsite-preparation
tracked excavator
1m
valve vault
valve-vault-installationpiping-assembly
excavator
1m
pipeline installation
pipeline-installationvalve-installation
hand-tools
1m
rebar formwork
rebar-assemblyformwork-installation
rebar
1m
rebar formwork
formwork-assemblyfoundation-preparation
electric-drill