No caption
IMG_6750.JPG
Details
Friday, March 21, 2025 · 2:32 PM
39.39141, -120.02124· 1683m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1613sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.3147
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:21
GPSDestBearing62.6540
GPSDestBearingRefTrue North
GPSHPositioningError8.5536
GPSImgDirection62.6540
GPSImgDirectionRefT
GPSSpeed1.7299
GPSSpeedRefK
GPSTimeStamp21:32:31
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-03-21T14:32:32.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.6554
Software18.4
SubjectArea{"0":2003,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized577
SubSecTimeOriginal577
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows several workers assembling wooden formwork around a circular foundation area. The ground within the area is covered with gravel, and wooded hills and trees surround the site. Workers are using tools and wearing safety gear including hard hats, hi-vis vests, and work boots. The formwork is constructed with wooden braces for support.
rebar-formwork
gravel-covered area overcast conditions spacious open area
PPE is clearly visible, providing worker safety.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
rebar formwork
rebar-formwork-setupmeasurement-activity
measuring-tape
0m
excavation
tank-foundation-excavationplastic-sheeting
dirt
0m
site grading
foundation-preparationsite-grading
plastic sheeting
1m
pipeline installation
pipeline-installationvalve-installation
hand-tools
1m
valve vault
valve-vault-installationpiping-assembly
excavator
1m
other
liftingcraning
crane
1m
backfill
backfillpipe-installation
shovel
1m
rebar formwork
formwork-assemblyrebar-placement
gravel
1m
excavation
excavationsurveying
surveying-tools
1m
excavation
foundation-preparationdirt-work
survey-equipment