No caption
IMG_2792.JPG
Details
Friday, January 30, 2026 · 3:19 PM
39.39257, -120.02262· 1631m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2703sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.9710
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:30
GPSDestBearing321.0734
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection321.0734
GPSImgDirectionRefT
GPSSpeed0.1803
GPSSpeedRefK
GPSTimeStamp23:19:24
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-30T15:19:24.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.4002
Software26.2.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized429
SubSecTimeOriginal429
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Not yet analyzed.
Nearby Photos
1m
backfill
backfilltrench-compaction
excavator
1m
site grading
site-gradingearthwork
soil
1m
site grading
site-gradingconstruction-equipment
backhoe loader
2m
pipeline installation
duct-bank-installationtrenching
PVC conduits
2m
pipeline installation
conduit-installationduct-bank-installation
pvc pipes
3m
trenching
trenchingduct-bank-installation
excavator
3m
site grading
site-gradingexcavation
John Deere excavator
3m
survey layout
survey-layoutsurveying-equipment
surveying-instrument
3m
swppp erosion control
swppperosion-control
loader
3m
site grading
site-preparationmarker-placement
soil