No caption
IMG_2790.JPG
Details
Friday, January 30, 2026 · 3:19 PM
39.39254, -120.02261· 1632m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1314sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.9307
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:30
GPSDestBearing285.5634
GPSDestBearingRefTrue North
GPSHPositioningError4.4308
GPSImgDirection285.5634
GPSImgDirectionRefT
GPSSpeed0.2800
GPSSpeedRefK
GPSTimeStamp23:19:19
HostComputeriPhone 16 Pro
latitude39.3925
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-30T15:19:20.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.3598
Software26.2.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized021
SubSecTimeOriginal021
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction site with a large tarp covering materials or equipment in the center. A loader is positioned on the left side of the image. There are piles of rocks and earth around the site, indicating site grading activity. The location is in a hilly or mountainous area, as visible by the terrain in the background.
site-grading
dirt and rock clear weather, natural lighting ample open space for staging
No specific safety features or PPE are visible in the frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingduct-bank-installation
excavator
1m
site grading
site-gradingcompacting
roller compactor
1m
pipeline installation
conduit-installationduct-bank-installation
pvc pipes
1m
pipeline installation
duct-bank-installationtrenching
PVC conduits
1m
site grading
site-levelingearth-moving
backhoe-loader
2m
pipeline installation
duct-bank-installationconduit-laying
pickup truck
3m
swppp erosion control
erosion-controlgravel
gravel
3m
site grading
excavationsite-preparation
excavator
3m
site grading
site-gradingearthwork
soil
3m
backfill
backfilltrench-compaction
excavator