No caption
IMG_0591.JPG
Details
Wednesday, October 1, 2025 · 12:11 PM
39.39257, -120.02263· 1636m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1464sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.2017
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:01
GPSDestBearing166.3438
GPSDestBearingRefTrue North
GPSHPositioningError14.7731
GPSImgDirection166.3438
GPSImgDirectionRefT
GPSSpeed0.9257
GPSSpeedRefK
GPSTimeStamp19:11:23
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-10-01T12:11:24.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5158
Software26.0
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized628
SubSecTimeOriginal628
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavator performing backfill operations beside installed welded steel pipes. A small compactor is visible within the trench, indicating soil compaction activities. The area is set in a natural landscape with surrounding slopes and trees. No active workers or specific safety measures are visible.
backfill
trench with soil backfill overcast daylight equipment positioned on loose soil surface
No specific safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
excavationsite-preparation
excavator
1m
site grading
site-gradingearthwork
soil
2m
site grading
site-levelingearth-moving
backhoe-loader
2m
site grading
site-gradingrocks
excavator
3m
concrete work
concrete-pouringtrench-filling
cement truck
3m
site grading
gradingsite-grading
compactor
3m
trenching
trenchingduct-installation
excavator
3m
trenching
trenchingduct-bank-installation
excavator
3m
pipeline installation
conduit-installationduct-bank-installation
pvc pipes
3m
pipeline installation
duct-bank-installationtrenching
PVC conduits