No caption
IMG_7925.JPG
Details
Wednesday, May 21, 2025 · 10:09 AM
39.39256, -120.02260· 1634m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3021sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.0928
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:21
GPSDestBearing356.3734
GPSDestBearingRefTrue North
GPSHPositioningError3.9063
GPSImgDirection356.3734
GPSImgDirectionRefT
GPSSpeed0.1382
GPSSpeedRefK
GPSTimeStamp17:9:5
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-05-21T10:09:05.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.5609
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized821
SubSecTimeOriginal821
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows several PVC conduits laid parallel within a trench, supported by black racks or spacers. The conduits are aligned and positioned in groups of three to four. The trench seems recently excavated with loose soil piled on the sides. There is evidence of ongoing conduit installation work.
pipeline-installation
trench with loose soil bright daylight clear trench access
Safety features such as PPE or barriers are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
pipeline installation
conduit-installationduct-bank-installation
pvc pipes
1m
site grading
site-gradingmaterial-staging
loader
1m
site grading
site-levelingearth-moving
backhoe-loader
2m
trenching
trenchingduct-bank-installation
excavator
2m
survey layout
survey-layoutsurveying-equipment
surveying-instrument
2m
pipeline installation
duct-bank-installationconduit-laying
pickup truck
2m
swppp erosion control
erosion-controlgravel
gravel
2m
site grading
site-gradingcompacting
roller compactor
2m
site grading
excavationsite-preparation
excavator
3m
site grading
site-gradingearth-moving
excavator